JMD Ashiana-9560368585,9999482030

 
 
ENQUIRY FORM
Name:*
Email:*
Contact:*
Enquiry:*
 
 
     

kdp grand savanna

Growth, the only single word is enough to define what is KDP. It is moving forward by leaps and Bounds. Despite rapid ebb and flow in economy, group is very adamant about its objectives and it has been able to sustain its growth.

KDP Infrastructure is certified by ISO 9001 & 14001. Whether it is Commercial or Residential, group has always been bestowed its best efforts to give you the best value for your money. Recently group has successfully finished its projects Greater Noida Commercial Complex. Its current project Grand Savanna is one of the finest Residential Project on NH 58. It is spread across the 13 acres land on 6 lane highway, Raj Nagar Extension, Ghaziabad which consists of 1160 Flats, it has commercial area of 25000 Sq. Ft.
  
For best deals please visit

- Videophone Door Security System
- Corner Project on 6 lane Express Way
- 80 % Open Area
- Luxury Living
- Convenient Shopping Mall
- 24 Hrs CCTV with IR Camera Security
- Club (Ultra modern Gym, Indore Games, Amphitheater, Yoga Centre, Multi Purpose Hall, Day Creche)
- Extensive Landscaping all around ( Park )
- Dedicated Sports Zone ( 2 Acres )
- Jogging & Walking Track
- Category    Area (Sq. Ft.)    Cost (BSP)
- 2 BHK    1250    22.42 Lacs
- 3 BHK    1550    27.80 Lacs

Category Area (Sq. Ft.) Cost (BSP)
2 BHK 1250  22.42 Lacs
3 BHK 1550 27.80 Lacs


Specification :

 
Wall Finish
 
Living/Dining/Bedrooms : Painted in pleasing shades of Design Prints of Oil Bound
Lift Lobbies : Selected Marble / Granite Cladding & Acrylic
External : Combination of Stone / Textured Paint Finish
Floorings
Living/Dining/Bedrooms : Designer Marble / Vitrified Tiles all over the unit
Lift Lobbies : Selected Granite / Marble
External : Anti Skid Ceramic Tiles
Terrace : Anti Skid Ceramic Tiles
 
Kitchen
Flooring : Ceramic Tiles
Dado : Ceramic Tiles above working platform, rest Acrylic Emulsion Paint
Platform Board : Granite counter with single bowl stainless steel sink with drain
Indepentdent R.O.Unit
Toilets
Flooring : Ceramic Tiles / Granite / Marble
Dado : Selected Ceramic Tiles
Fittings : Granite / Marble Counter, white sanitary fixtures, single lever CP fittings
Gysers in all Bathrooms
Wardrobes : In all Bedrooms
Electrical Works : Electrical installation in concealed conduit with copper wire
Doors : Seasoned hardwood frames. Panel / Teak moulded main doors / flush doors
Windows : Powder Coated / Anodized Aluminum Glazing
Club : Ultramodern Club with Recreational Facilities
Power back-up : On Paid - Basis
Fire fighting arrangements : As per prescribed norms
Paved Internal path with lightings : Ultramodern lighting system to beautify and illuminate the whole complex
Safety and Security : Round-the-clock-security

Rate List:
PHASE –I
 
UNIT SUPER AREA*(SQ.FT) PAYMENT PLAN CASH DOWN
(BSP @ 2150/ SQ.FT)
 
2 BHK 1250 SQ.FT*  26,87,500/-  
3 BHK 1550 SQ.FT*  33,32,500/-  
*Above mentioned area is tentative in nature and subject to revision
 
PHASE – II
 
UNIT SUPER AREA*(SQ.FT) PAYMENT PLAN CASH DOWN
(BSP @ 2150/ SQ.FT.)
 
2 BHK 825 SQ.FT*  17,73,750/-  
3 BHK 1125 SQ.FT*  24,18,750/-  
*Above mentioned area is tentative in nature and subject to revision
 
 
UNIT SUPER AREA*(SQ.FT) PAYMENT PLAN-CASH DOWN
(BSP @ 1978/SQ.FT.)**
PAYMENT PLAN-CONSTRUCTION LINK
(BSP @ 2150/ SQ.FT.)
 
2 BHK 1250 SQ.FT*  24,72,500/-  26,87,500/-
3 BHK 1250 SQ.FT*  24,72,500/-  26,87,500/-
3 BHK 1550 SQ.FT*  30,65,900/-  33,32,500/-
*Above mentioned area is tentative in nature and subject to revision
 
** Above mentioned Price is after 8% discount and subject to revision
 
 
 
 

Payment should be made in favour of “K.D.P. Infrastructure Pvt. Ltd.”

Additional Charges

  1. PLC for floors :- Ground Floor-  150 /-per SQ.FT., 1st foor-  75/-per SQ.FT. , 2nd floor-  50/- per SQ.FT. , 3rd floor-  25/- per SQ.FT. 
     
  2. PLC for preferential location (applicable on all floor):- Park facing, corner, swimming pool & club, outer road – PLC 50/- each per SQ.FT.
     
  3. Parking Development Charges (covered) -  2,00,000 Mandatory, ADC- .120/- per SQ.FT.

  4. IFMS (one time)- 50/- per SQ.FT., EEC –  35/- per sq ft, FFC –  35/-per SQ.FT., power back-up (min 3 Kva)-  20000/- per kva
    Club membership (one time)-  50,000/- (Mandatory),


Note: -
  1. Service Tax, Registry Expenses, Stamp Duty and other applicable Government & GDA Charges & Statutory Levies, if any, will be charged extra and are to be borne by the Customer.

  2. The above mentioned rates can be withdrawn and revised at the discretion of the company..

  3. Acceptance of the registration form is solely based on discretion of the company and company reserves the right to accept or reject any form without giving any reason whatsoever.

  4. Registration of flats is subject to terms and conditions.
     
  5. Out Station Cheque are not accepted.
     
  6. Prices are escalation free
1 SQ. Meter = 10.76 SQ.FT*

Payment Plans:
PLAN A: -  DOWN PAYMENT PLAN
 
Registration amount# As Applicable
At the time of Booking 15% Cost of the Flat
Within 30 days of Booking 80% Cost of the Flat
On Offer of Possession 5% Cost of the Flat + Stamp Duty and Other Charges if applicable
 
PLAN B: -  CONSTRUCTION LINKED INSTALLMENT PLAN
 
Registration amount# As Applicable
At the time of Booking 15%  Cost of the Flat
With in 30days of Booking 10%  Cost of the Flat
Start of construction 10% Cost of the Flat
On casting of ground floor roof 5% Cost of the Flat
On casting of first floor roof 5% Cost of the Flat
On casting of 2 floor roof 5% Cost of the Flat
On casting of 3 floor roof 5% Cost of the Flat
On casting of 4 floor roof 5% Cost of the Flat
On casting of 5 floor roof 5% Cost of the Flat
On casting of 6 floor roof 5% Cost of the Flat
On casting of 7 floor roof 5% Cost of the Flat
On casting of 8 floor roof 5% Cost of the Flat
On casting of 9 floor roof 5% Cost of the Flat
On casting of 10+11 floor roof 5% Cost of the Flat
On completion of internal plaster & Flooring within apartment 5% Cost of the Flat
On Offer of possession 5% Cost of the Flat + Stamp Duty and other Charges if applicable
 
 
 

Payment should be made in favour of "K.D.P. Infrastructure Pvt. Ltd."

Additional Charges

  1. PLC for floors (Rs.Per sq ft):- 1st floor-Rs 75/- , 2nd floor-Rs 50/-, 3rd floor-Rs 25/-
     
  2. PLC for preferential location (applicable on all floor):- Park facing, corner, swimming pool & club, outer road, commercial facing - 50/- each per sq. ft.
     
  3. Parking covered - Rs 1, 35,000 Mandatory, EDC-Rs.100/- per sq.ft.

  4. IFMS (one time)-Rs 50/- per sq ft, EEC - Rs 30/- per sq ft, FFC - Rs 30/-per sq, ft., power back-up (min 3 Kva)- Rs 20,000/- per kva. , Club membership (one time)- Rs 50,000/-(mandatory).

Note: -
  1. Registry Expenses, Stamp Duty and other applicable Government & GDA Charges & Statutory Levies, if any, will be charged extra and are to be borne by the Customer.
     
  2. The above mentioned rates can be withdrawn and revised at the discretion of the company.
     
  3. Acceptance of the registration form is solely based on discretion of the company and company reserves the right to accept or reject any form without giving any reason whatsoever
     
  4. Registration of flats is subject to terms and conditions
     
  5. Out Station Cheque are not accepted.
     
  6. Prices are escalation free.

    * 1 sq. Meter = 10.76 sq. ft





Layout plan

 
Contact for this project
  • JMD Ashiana-9560368585,9999482030
Copyright © 2012 All Rights Reserved. Powered by : 77acres.com Designed & Developed by: 77Acres